Notebook
13.10.20 Preparing Agar Plates and Media
14.10.20: GoldenGate Assemblies (Manual)
14.10.20 Mini-prep BASIC SEVA 36 Plasmids
16.10.20 Preparation of Linkers
19.10.20 BASIC Assemblies (Manual)
19.10.20 Dry-run of Opentrons Scripts (MoClo, BASIC)
21.10.20 BASIC Validation Assemblies (OT2)
22.10.20 Mini-prep of BioBricks
22.10.20 MoClo Validation Assemblies (OT2)
23.10.20 BioBricks Validation Assembly (OT2)
26.10.20 BASIC Validation Assemblies 2 (OT2)