Difference between revisions of "Team:BITSPilani-Goa India/Notebook"

 
Line 1: Line 1:
<html lang="en"><head><meta charset="utf-8"/><meta content="width=device-width,initial-scale=1" name="viewport"/><title>Notebook | SugarGain | iGEM BITS Goa</title><link href="https://2020.igem.org/Template:BITSPilani-Goa_India/css/notebookCSS?action=raw&amp;ctype=text/css" rel="stylesheet"/></head><body><div id="safari-toast"><p>The Safari browser doesn't support some features of this website. Please switch to Firefox, Edge or Chrome for a better experience.</p></div><nav id="main-nav"><div class="navbar bg-none nav-transparent"><div class="row" id="navbar-row"><a class="navbar-brand" href="https://2020.igem.org/Team:BITSPilani-Goa_India"><i class="navbar-logo"></i><span> Sugar<strong>Gain</strong></span></a><div class="controls h-100 d-flex align-items-center"><div class="align-items-center" id="themeSwitchWrapper"><i class="icon-light"></i><div id="themeSwitch"><label class="switch" for="themeSwitchInput"><input id="themeSwitchInput" type="checkbox"/><span class="slider round"></span></label></div><i class="icon-dark"></i></div><button class="btn" id="menuSwitch"><div class="menu-icon"></div></button></div></div><div class="row w-100" id="progress-container-wrapper"><div id="progress-container"><div id="nav-progress-bar"></div></div></div></div><div id="fullscreenMenuWrapper"><div class="w-100 h-100" id="fullscreenMenu"><div class="container-fluid d-flex align-items-stretch pr-0 flex-column"><div class="row nav-header w-100"><div class="col-xl-3 col-lg-2"><div class="teamLogo"></div></div><div class="col-xl-6 col-lg-8"></div><div class="col-xl-3 col-lg-2"></div></div><div class="row flex-grow-1 w-100"><div class="col-xl-3 col-lg-2"></div><div class="col-xl-6 col-lg-8 d-flex justify-content-between flex-column" id="menuContent"><div class="row"><div class="col-md-6" id="nav-headings"><ul role="tablist"><li><a href="javascript:;" id="Project-tab">Project</a><ul class="mobile-nav-items"><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Description">Description</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Design">Design</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Model">Model</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Engineering">Engineering</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Safety">Safety</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Implementation">Implementation</a></li></ul></li><li><a href="javascript:;" id="Human_Practices-tab">Human Practices</a><ul class="mobile-nav-items"><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Human_Practices">Human-Centered Design</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Education">Science Communication</a></li></ul></li><li><a href="javascript:;" id="Parts-tab">Parts</a><ul class="mobile-nav-items"><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Parts">Parts</a></li></ul></li><li><a href="javascript:;" id="Journal-tab">Journal</a><ul class="mobile-nav-items"><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Notebook">Notebook</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Experiments">Experiments</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Appendix">Appendix</a></li></ul></li><li><a href="javascript:;" id="Team-tab">Team</a><ul class="mobile-nav-items"><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Team">Team</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Attributions">Attributions</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Collaborations">Collaborations</a></li></ul></li><li><a href="javascript:;" id="Contribution-tab">Contribution</a><ul class="mobile-nav-items"><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Contribution">Overview</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Software">Software</a></li></ul></li><li><a href="javascript:;" id="Entrepreneurship-tab">Entrepreneurship</a><ul class="mobile-nav-items"><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Entrepreneurship">Entrepreneurship</a></li></ul></li><li><a href="javascript:;" id="Judging-tab">Judging</a><ul class="mobile-nav-items"><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Judging">Judging</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/https:/igem.org/2020_Judging_Form?id=3512">Judging Form</a></li></ul></li></ul></div><div class="col-6" id="nav-items"><div class="tab-content"><div class="tab-pane" id="Project-pane"><ul><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Description">Description</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Design">Design</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Model">Model</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Engineering">Engineering</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Safety">Safety</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Implementation">Implementation</a></li></ul></div><div class="tab-pane" id="Human_Practices-pane"><ul><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Human_Practices">Human-Centered Design</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Education">Science Communication</a></li></ul></div><div class="tab-pane" id="Parts-pane"><ul><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Parts">Parts</a></li></ul></div><div class="tab-pane" id="Journal-pane"><ul><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Notebook">Notebook</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Experiments">Experiments</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Appendix">Appendix</a></li></ul></div><div class="tab-pane" id="Team-pane"><ul><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Team">Team</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Attributions">Attributions</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Collaborations">Collaborations</a></li></ul></div><div class="tab-pane" id="Contribution-pane"><ul><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Contribution">Overview</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Software">Software</a></li></ul></div><div class="tab-pane" id="Entrepreneurship-pane"><ul><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Entrepreneurship">Entrepreneurship</a></li></ul></div><div class="tab-pane" id="Judging-pane"><ul><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Judging">Judging</a></li><li><a href="https://igem.org/2020_Judging_Form?id=3512">Judging Form</a></li></ul></div></div></div></div><div class="row"><div id="contact-links"><ul><li><a href="https://instagram.com/igem_bits" rel="noopener" target="_blank"><i class="insta"></i><span>Instagram</span></a></li><li><a href="https://twitter.com/igembitsgoa" rel="noopener" target="_blank"><i class="twitter"></i><span>Twitter</span></a></li><li><a href="mailto:igembitsgoa@gmail.com" rel="noopener" target="_blank"><i class="email"></i><span>Email</span></a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Sample"><i class="sample"></i><span>Sample</span></a></li></ul><ul><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Acknowledgements">Acknowledgements</a></li></ul></div></div></div><div class="col-xl-3 col-lg-2"></div></div><div class="row nav-footer w-100"><div class="col-xl-3 col-lg-2"></div><div class="col-xl-6 col-lg-8"></div><div class="col-xl-3 col-lg-2"></div></div></div></div></div></nav><style>#header-background {
+
<html lang="en"><head><meta charset="utf-8"/><meta content="width=device-width,initial-scale=1" name="viewport"/><title>Notebook | SugarGain | iGEM BITS Goa</title><link href="https://2020.igem.org/Template:BITSPilani-Goa_India/css/notebookCSS?action=raw&amp;ctype=text/css" rel="stylesheet"/></head><body><div id="safari-toast"><p>The Safari browser doesn't support some features of this website. Please switch to Firefox, Edge or Chrome for a better experience.</p></div><nav id="main-nav"><div class="navbar bg-none nav-transparent"><div class="row" id="navbar-row"><a class="navbar-brand" href="https://2020.igem.org/Team:BITSPilani-Goa_India"><i class="navbar-logo"></i><span> Sugar<strong>Gain</strong></span></a><div class="controls h-100 d-flex align-items-center"><div class="align-items-center" id="themeSwitchWrapper"><i class="icon-light"></i><div id="themeSwitch"><label class="switch" for="themeSwitchInput"><input id="themeSwitchInput" type="checkbox"/><span class="slider round"></span></label></div><i class="icon-dark"></i></div><button class="btn" id="menuSwitch"><div class="menu-icon"></div></button></div></div><div class="row w-100" id="progress-container-wrapper"><div id="progress-container"><div id="nav-progress-bar"></div></div></div></div><div id="fullscreenMenuWrapper"><div class="w-100 h-100" id="fullscreenMenu"><div class="container-fluid d-flex align-items-stretch pr-0 flex-column"><div class="row nav-header w-100"><div class="col-xl-3 col-lg-2"><div class="teamLogo"></div></div><div class="col-xl-6 col-lg-8"></div><div class="col-xl-3 col-lg-2"></div></div><div class="row flex-grow-1 w-100"><div class="col-xl-3 col-lg-2"></div><div class="col-xl-6 col-lg-8 d-flex justify-content-between flex-column" id="menuContent"><div class="row"><div class="col-md-6" id="nav-headings"><ul role="tablist"><li><a href="javascript:;" id="Project-tab">Project</a><ul class="mobile-nav-items"><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Description">Description</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Design">Design</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Model">Model</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Engineering">Engineering</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Safety">Safety</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Implementation">Implementation</a></li></ul></li><li><a href="javascript:;" id="Human_Practices-tab">Human Practices</a><ul class="mobile-nav-items"><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Human_Practices">Human-Centered Design</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Education">Science Communication</a></li></ul></li><li><a href="javascript:;" id="Parts-tab">Parts</a><ul class="mobile-nav-items"><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Parts">Parts</a></li></ul></li><li><a href="javascript:;" id="Journal-tab">Journal</a><ul class="mobile-nav-items"><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Notebook">Notebook</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Experiments">Experiments</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Appendix">Appendix</a></li></ul></li><li><a href="javascript:;" id="Team-tab">Team</a><ul class="mobile-nav-items"><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Team">Team</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Attributions">Attributions</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Collaborations">Collaborations</a></li></ul></li><li><a href="javascript:;" id="Contribution-tab">Contribution</a><ul class="mobile-nav-items"><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Contribution">Overview</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Software">Software</a></li></ul></li><li><a href="javascript:;" id="Entrepreneurship-tab">Entrepreneurship</a><ul class="mobile-nav-items"><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Entrepreneurship">Entrepreneurship</a></li></ul></li><li><a href="javascript:;" id="Judging-tab">Judging</a><ul class="mobile-nav-items"><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Judging">Judging</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Awards">Awards</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/https:/igem.org/2020_Judging_Form?id=3512">Judging Form</a></li></ul></li></ul></div><div class="col-6" id="nav-items"><div class="tab-content"><div class="tab-pane" id="Project-pane"><ul><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Description">Description</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Design">Design</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Model">Model</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Engineering">Engineering</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Safety">Safety</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Implementation">Implementation</a></li></ul></div><div class="tab-pane" id="Human_Practices-pane"><ul><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Human_Practices">Human-Centered Design</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Education">Science Communication</a></li></ul></div><div class="tab-pane" id="Parts-pane"><ul><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Parts">Parts</a></li></ul></div><div class="tab-pane" id="Journal-pane"><ul><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Notebook">Notebook</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Experiments">Experiments</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Appendix">Appendix</a></li></ul></div><div class="tab-pane" id="Team-pane"><ul><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Team">Team</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Attributions">Attributions</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Collaborations">Collaborations</a></li></ul></div><div class="tab-pane" id="Contribution-pane"><ul><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Contribution">Overview</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Software">Software</a></li></ul></div><div class="tab-pane" id="Entrepreneurship-pane"><ul><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Entrepreneurship">Entrepreneurship</a></li></ul></div><div class="tab-pane" id="Judging-pane"><ul><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Judging">Judging</a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Awards">Awards</a></li><li><a href="https://igem.org/2020_Judging_Form?id=3512">Judging Form</a></li></ul></div></div></div></div><div class="row"><div id="contact-links"><ul><li><a href="https://instagram.com/igem_bits" rel="noopener" target="_blank"><i class="insta"></i><span>Instagram</span></a></li><li><a href="https://twitter.com/igembitsgoa" rel="noopener" target="_blank"><i class="twitter"></i><span>Twitter</span></a></li><li><a href="mailto:igembitsgoa@gmail.com" rel="noopener" target="_blank"><i class="email"></i><span>Email</span></a></li><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Sample"><i class="sample"></i><span>Sample</span></a></li></ul><ul><li><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Acknowledgements">Acknowledgements</a></li></ul></div></div></div><div class="col-xl-3 col-lg-2"></div></div><div class="row nav-footer w-100"><div class="col-xl-3 col-lg-2"></div><div class="col-xl-6 col-lg-8"></div><div class="col-xl-3 col-lg-2"></div></div></div></div></div></nav><style>#header-background {
 
     background-image: url(https://static.igem.org/mediawiki/2020/5/5d/T--BITSPilani-Goa_India--img--Notebook--header.svg);
 
     background-image: url(https://static.igem.org/mediawiki/2020/5/5d/T--BITSPilani-Goa_India--img--Notebook--header.svg);
 
}
 
}
 
header {
 
header {
 
     background-color: #fcb4cc;
 
     background-color: #fcb4cc;
}</style><header class="d-flex justify-content-center"><div class="custom-container"><div id="header-background"></div><div id="heading"><h1>Notebook</h1></div><a href="https://freepik.com" rel="noopener" target="_blank"><span data-placement="top" id="bg-attribution" title="Photo from Freepik"></span></a></div></header><main class="theme-journal"><div class="custom-container"><div class="row"><div class="sidebar"><div class="nav" id="months"><ul></ul></div></div><div class="content"><div id="dropdown-container"><select class="custom-select" id="months-dropdown" name="months-dropdown"><option selected="selected" value="Jan20">January 2020</option><option value="Feb20">February 2020</option><option value="Mar20">March 2020</option><option value="Apr20">April 2020</option><option value="May20">May 2020</option><option value="Jun20">June 2020</option><option value="Jul20">July 2020</option><option value="Aug20">August 2020</option><option value="Sep20">September 2020</option></select></div><div class="month" id="Jan20"><article><h2>January 2020</h2><div class="week week1"><h1>Week 1</h1><ul><li><strong>4th:</strong> We had our first full team meeting!</li></ul></div><div class="week week2"><h1>Week 2</h1><ul><li><strong>6th - 15th:</strong> Brainstormed about various project ideas with our PI and decided to work on post-harvest losses in sugarcane.</li><li><strong>15th:</strong> We attended the BITSAA Global Meet that provided us with the opportunity to interact with alumni from our university, pitch our project idea and gain valuable feedback.</li><li><strong>18th:</strong> We met with Mr Sunil Kumar Ohri from the Sugar Federation in UP.</li></ul></div><div class="week week3"><h1>Week 3</h1><p>We conducted our initial growth curve experiments in sugarcane media. We looked at multiple dilutions and clarification methods.</p></div><div class="week week4"><h1>Week 4</h1><p>We brainstormed about the growth curve model and completed the experiments.</p></div></article></div><div class="month" id="Feb20"><article><h2>February 2020</h2><div class="week week1"><h1>Week 1</h1><ul><li><strong>2nd:</strong> We had our first meeting with Varsha Jaisimha (iGEM Ambassador to Asia Pacific). Since we are a first time team, she was instrumental in guiding us on how to get started.</li></ul><p>Our team conducted extensive research and literature review. We also began our sponsorship drives and our crowd funding initiatives.</p></div><div class="week week2"><h1>Week 2</h1><p>We met our PI to work out finer details about our project and thought about how to incorporate Varsha's initial feedback.</p></div><div class="week week3"><h1>Week 3</h1><p>We began our initial PCR of invertase of <em>Arabidopsis thalliana</em>.</p></div><div class="week week4"><h1>Week 4</h1><p>We were on a break this week due to our midterms.</p></div></article></div><div class="month" id="Mar20"><article><h2>March 2020</h2><div class="week week1"><h1>Week 1</h1><p>MIDTERM WEEK!</p></div><div class="week week2"><h1>Week 2</h1><ul><li><strong>13th:</strong> We began our experiments for capillary action in sugarcane.</li><li><strong>14th:</strong> Instruction at university was suspended in lieu of the COVID-19 pandemic.</li></ul></div><div class="week week3"><h1>Week 3</h1><p>No work could be done as everyone was still adjusting to the new normal.</p></div><div class="week week4"><h1>Week 4</h1><p>We had our first virtual team meeting! This meeting was crucial for us to redefine our approach. We formulated a weekly schedule for our team meetings.</p><p>We restructured our team into subgroups and decided to meet twice a week for working sessions.</p></div></article></div><div class="month" id="Apr20"><article><h2>April 2020</h2><div class="week week1"><h1>Week 1</h1><ul><li><strong>1st - 7th:</strong> We had the meetings for the sequences and modelling teams.</li></ul></div><div class="week week2"><h1>Week 2</h1><p>We had follow up meetings with Varsha to discuss how to go about our project virtually.</p></div><div class="week week3"><h1>Week 3</h1><p>We started designing the Atmosphere Regulated Killswitch (BBa_K3512042). We began formulating the design of the model for the killswitch.</p></div><div class="week week4"><h1>Week 4</h1><p>Conducted literature review for the pFruB-Cra module and the kill switch to determine a few parameters.</p></div></article></div><div class="month" id="May20"><article><h2>May 2020</h2><div class="week week1"><h1>Week 1</h1><ul><li>We conducted docking studies of anti-invertase and invertase.</li><li>We also modified our approach in the <em>in silico</em> modelling of our pFruB-Cra system and kill switch.</li><li>Our wet lab team began the construction of the pFruB-Cra sequences.</li><li>We searched for contacts of farmers to augment our human practices approach.</li></ul></div><div class="week week2"><h1>Week 2</h1><p>We continued working on tasks from the previous week and set up meetings with farmers in Gulbarga and Mandya.</p></div><div class="week week3"><h1>Week 3</h1><ul><li>We met the farmers from Gulbarga and Mandya.</li></ul></div><div class="week week4"><h1>Week 4</h1><p>We thought about how we could implement their suggestions in our design.</p></div></article></div><div class="month" id="Jun20"><article><h2>June 2020</h2><div class="week week1"><h1>Week 1</h1><ul><li>We created the initial model of our kill switch and growth curve. We also sent our biobrick sequences to our PI for verification.</li><li>We met the Chief Chemist from the Kichha Sugar Company.</li></ul></div><div class="week week2"><h1>Week 2</h1><ul><li>13th: We began our collaboration with Abhigyaan — a student run organization at BITS Goa.</li><li>19th: We met the iGEM OSU team regarding biocontainment and kill switch modelling.</li></ul></div><div class="week week3"><h1>Week 3</h1><ul><li>23rd: We had our first meeting with the University of Rochester and IITM and the Accessibility Initiative was started!</li><li>We made an initial prototype for WikiSync.</li></ul></div><div class="week week4"><h1>Week 4</h1><ul><li>30th: We met a farmer from the Tamil Nadu belt.</li><li>Set up Travis for CI/CD for development of WikiSync.</li></ul></div></article></div><div class="month" id="Jul20"><article><h2>July 2020</h2><div class="week week1"><h1>Week 1</h1><ul><li>4th: We met with the iGEM Groningen Team and learnt more about their project.</li><li>We started formulating a plan for the modelling of the biosensor.</li><li>We also had a meeting with our secondary PI to discuss various experimental designs that can be implemented.</li><li>Reorganized WikiSync codebase to split into modules for easier debugging.</li><li>We started working on our wiki and the Wiki Starter Pack.</li></ul></div><div class="week week2"><h1>Week 2</h1><ul><li>14th: We met with Andre Hermann regarding the sugar industry in Brazil and guidance on policy making. We also released our project logo!</li><li>15th: We started our Humans of iGEM initiative.</li><li>We incorporated feedback from iGEM Groningen into our kill switch model.</li><li>We wrote file classes, a basic HTML parser and started building the upload map functionality for WikiSync.</li><li>We added automatic citations functionality to the Wiki Starter Pack.</li></ul></div><div class="week week3"><h1>Week 3</h1><ul><li>22nd: We met with Dr Bejoy Thomas about our economic modelling.</li><li>25th: We hosted the first ever BioSummit!</li><li>Added a CSS parser to WikiSync.</li><li>Start writing tests for WikiSync.</li><li>Added some more features to Starter Pack.</li></ul></div><div class="week week4"><h1>Week 4</h1><ul><li>31st: The Indian teams got together for the first All India iGEM Meet!</li><li>Start writing documentation for WikiSync and Starter Pack along with more tests.</li></ul></div></article></div><div class="month" id="Aug20"><article><h2>August 2020</h2><div class="week week1"><h1>Week 1</h1><ul><li>We continued consulting with iGEM Groningen on our killswitch model and and began rethinking our approach. We also completed our biosensor model.</li><li>The required experimental protocols were finalised.</li><li>More tests and documentation for WikiSync.</li><li>Prepared Starter Pack for release during the Global Meetup.</li></ul></div><div class="week week2"><h1>Week 2</h1><ul><li>Our college reopened for the fall semester.</li><li>We practiced with iGEM Rochester for our Global Meetup sessions and recorded them.</li></ul></div><div class="week week3"><h1>Week 3</h1><ul><li>19th - 22nd: Our team hosted sessions during the Global Meetup.</li><li>We wrote usage guides for WikiSync along with some more features.</li></ul></div><div class="week week4"><h1>Week 4</h1><ul><li>30th: We had our first meeting with Synbio for Everyone where we discussed about our Accessibility initiative.</li><li>We restructured our economic model based on the feedback recieved during our AIIM presentation.</li></ul></div></article></div><div class="month" id="Sep20"><article><h2>September 2020</h2><div class="week week1"><h1>Week 1</h1><ul><li>We completed our model for the inoculant as well as auxotroph design.</li><li>We began designing the process flow diagram and industrial application of our product.</li><li>9th: We finalised our wiki illustrations and design!</li></ul></div><div class="week week2"><h1>Week 2</h1><ul><li>We began brainstorming on ideas for our promotional video and reached out to the Mime Club on campus.</li><li>We wrapped-up the Language project.</li></ul></div><div class="week week3"><h1>Week 3</h1><ul><li>This week was spent finalising our safety forms after feedback from PI.</li><li>We also submitted our biosafety proposal to the Biosafety Committee on campus.</li></ul></div><div class="week week4"><h1>Week 4</h1><p>MIDTERM WEEK!</p></div></article></div><div class="month" id="Oct20"><article><h2>October 2020</h2><div class="week week1"><h1>Week 1</h1><p>We started writing first drafts for the content on our wiki and worked on its design.</p></div><div class="week week2"><h1>Week 2</h1><ul><li>We completed animations for our homepage and added all the pages as per the Judging Form.</li></ul></div><div class="week week3"><h1>Week 3</h1><ul><li>We geared up for the wiki freeze and started working on the presentation video.</li></ul></div><div class="week week4"><h1>Week 4</h1><p>WIKI FREEZE!</p></div></article></div><div id="buttons"><a class="button prev" href="https://2020.igem.org/Team:BITSPilani-Goa_India"><span class="button-background"><span aria-hidden="" class="circle"><span class="icon arrow"></span></span></span><span class="button-text">Home</span></a><a class="button next" href="https://2020.igem.org/Team:BITSPilani-Goa_India/Experiments"><span class="button-background"><span aria-hidden="" class="circle"><span class="icon arrow"></span></span></span><span class="button-text">Experiments</span></a></div></div></div></div></main><footer><div id="footerNav"><div class="container"><div class="row justify-content-between"><div class="col-sm-6 col-md-4 col-lg-3 py-2"><a class="footer-heading">Project</a><ul><li class="py-1"><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Description">Description</a></li><li class="py-1"><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Design">Design</a></li><li class="py-1"><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Model">Model</a></li><li class="py-1"><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Engineering">Engineering</a></li><li class="py-1"><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Safety">Safety</a></li><li class="py-1"><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Implementation">Implementation</a></li></ul></div><div class="col-sm-6 col-md-4 col-lg-3 py-2"><a class="footer-heading">Human Practices</a><ul><li class="py-1"><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Human_Practices">Human-Centered Design</a></li><li class="py-1"><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Education">Science Communication</a></li></ul></div><div class="col-sm-6 col-md-4 col-lg-3 py-2"><a class="footer-heading">Parts</a><ul><li class="py-1"><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Parts">Parts</a></li></ul></div><div class="col-sm-6 col-md-4 col-lg-3 py-2"><a class="footer-heading">Journal</a><ul><li class="py-1"><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Notebook">Notebook</a></li><li class="py-1"><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Experiments">Experiments</a></li><li class="py-1"><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Appendix">Appendix</a></li></ul></div><div class="col-sm-6 col-md-4 col-lg-3 py-2"><a class="footer-heading">Team</a><ul><li class="py-1"><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Team">Team</a></li><li class="py-1"><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Attributions">Attributions</a></li><li class="py-1"><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Collaborations">Collaborations</a></li></ul></div><div class="col-sm-6 col-md-4 col-lg-3 py-2"><a class="footer-heading">Contribution</a><ul><li class="py-1"><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Contribution">Overview</a></li><li class="py-1"><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Software">Software</a></li></ul></div><div class="col-sm-6 col-md-4 col-lg-3 py-2"><a class="footer-heading">Entrepreneurship</a><ul><li class="py-1"><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Entrepreneurship">Entrepreneurship</a></li></ul></div><div class="col-sm-6 col-md-4 col-lg-3 py-2"><a class="footer-heading">Judging</a><ul><li class="py-1"><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Judging">Judging</a></li><li class="py-1"><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/https:/igem.org/2020_Judging_Form?id=3512">Judging Form</a></li></ul></div></div></div></div><div id="footerBrand"><div class="container"><div class="row justify-content-center"><div id="footerTeamLogo"></div><div id="BITSLogo"></div></div><p>iGEM BITS Goa</p><p>Birla Institute of Technology and Science, Pilani</p><p>K K Birla Goa Campus</p><p>NH-17B, Sancoale, Goa, India</p><div class="row justify-content-center" id="footerIcons"><a class="gmail" href="mailto:igembitsgoa@gmail.com"></a><a class="insta" href="https://instagram.com/igem_bits" rel="noopener" target="_blank"></a><a class="twitter" href="https://twitter.com/igembitsgoa" rel="noopener" target="_blank"></a></div></div></div></footer><script src="https://2020.igem.org/Template:BITSPilani-Goa_India/notebook-bundleJS?action=raw&amp;ctype=text/javascript"></script></body></html>
+
}</style><header class="d-flex justify-content-center"><div class="custom-container"><div id="header-background"></div><div id="heading"><h1>Notebook</h1></div><a href="https://freepik.com" rel="noopener" target="_blank"><span data-placement="top" id="bg-attribution" title="Photo from Freepik"></span></a></div></header><main class="theme-journal"><div class="custom-container"><div class="row"><div class="sidebar"><div class="nav" id="months"><ul></ul></div></div><div class="content"><div id="dropdown-container"><select class="custom-select" id="months-dropdown" name="months-dropdown"><option selected="selected" value="Jan20">January 2020</option><option value="Feb20">February 2020</option><option value="Mar20">March 2020</option><option value="Apr20">April 2020</option><option value="May20">May 2020</option><option value="Jun20">June 2020</option><option value="Jul20">July 2020</option><option value="Aug20">August 2020</option><option value="Sep20">September 2020</option></select></div><div class="month" id="Jan20"><article><h2>January 2020</h2><div class="week week1"><h1>Week 1</h1><ul><li><strong>4th:</strong> We had our first full team meeting!</li></ul></div><div class="week week2"><h1>Week 2</h1><ul><li><strong>6th - 15th:</strong> Brainstormed about various project ideas with our PI and decided to work on post-harvest losses in sugarcane.</li><li><strong>15th:</strong> We attended the BITSAA Global Meet that provided us with the opportunity to interact with alumni from our university, pitch our project idea and gain valuable feedback.</li><li><strong>18th:</strong> We met with Mr Sunil Kumar Ohri from the Sugar Federation in UP.</li></ul></div><div class="week week3"><h1>Week 3</h1><p>We conducted our initial growth curve experiments in sugarcane media. We looked at multiple dilutions and clarification methods.</p></div><div class="week week4"><h1>Week 4</h1><p>We brainstormed about the growth curve model and completed the experiments.</p></div></article></div><div class="month" id="Feb20"><article><h2>February 2020</h2><div class="week week1"><h1>Week 1</h1><ul><li><strong>2nd:</strong> We had our first meeting with Varsha Jaisimha (iGEM Ambassador to Asia Pacific). Since we are a first time team, she was instrumental in guiding us on how to get started.</li></ul><p>Our team conducted extensive research and literature review. We also began our sponsorship drives and our crowd funding initiatives.</p></div><div class="week week2"><h1>Week 2</h1><p>We met our PI to work out finer details about our project and thought about how to incorporate Varsha's initial feedback.</p></div><div class="week week3"><h1>Week 3</h1><p>We began our initial PCR of invertase of <em>Arabidopsis thalliana</em>.</p></div><div class="week week4"><h1>Week 4</h1><p>We were on a break this week due to our midterms.</p></div></article></div><div class="month" id="Mar20"><article><h2>March 2020</h2><div class="week week1"><h1>Week 1</h1><p>MIDTERM WEEK!</p></div><div class="week week2"><h1>Week 2</h1><ul><li><strong>13th:</strong> We began our experiments for capillary action in sugarcane.</li><li><strong>14th:</strong> Instruction at university was suspended in lieu of the COVID-19 pandemic.</li></ul></div><div class="week week3"><h1>Week 3</h1><p>No work could be done as everyone was still adjusting to the new normal.</p></div><div class="week week4"><h1>Week 4</h1><p>We had our first virtual team meeting! This meeting was crucial for us to redefine our approach. We formulated a weekly schedule for our team meetings.</p><p>We restructured our team into subgroups and decided to meet twice a week for working sessions.</p></div></article></div><div class="month" id="Apr20"><article><h2>April 2020</h2><div class="week week1"><h1>Week 1</h1><ul><li><strong>1st - 7th:</strong> We had the meetings for the sequences and modelling teams.</li></ul></div><div class="week week2"><h1>Week 2</h1><p>We had follow up meetings with Varsha to discuss how to go about our project virtually.</p></div><div class="week week3"><h1>Week 3</h1><p>We started designing the Atmosphere Regulated Killswitch (BBa_K3512042). We began formulating the design of the model for the killswitch.</p></div><div class="week week4"><h1>Week 4</h1><p>Conducted literature review for the pFruB-Cra module and the kill switch to determine a few parameters.</p></div></article></div><div class="month" id="May20"><article><h2>May 2020</h2><div class="week week1"><h1>Week 1</h1><ul><li>We conducted docking studies of anti-invertase and invertase.</li><li>We also modified our approach in the <em>in silico</em> modelling of our pFruB-Cra system and kill switch.</li><li>Our wet lab team began the construction of the pFruB-Cra sequences.</li><li>We searched for contacts of farmers to augment our human practices approach.</li></ul></div><div class="week week2"><h1>Week 2</h1><p>We continued working on tasks from the previous week and set up meetings with farmers in Gulbarga and Mandya.</p></div><div class="week week3"><h1>Week 3</h1><ul><li>We met the farmers from Gulbarga and Mandya.</li></ul></div><div class="week week4"><h1>Week 4</h1><p>We thought about how we could implement their suggestions in our design.</p></div></article></div><div class="month" id="Jun20"><article><h2>June 2020</h2><div class="week week1"><h1>Week 1</h1><ul><li>We created the initial model of our kill switch and growth curve. We also sent our biobrick sequences to our PI for verification.</li><li>We met the Chief Chemist from the Kichha Sugar Company.</li></ul></div><div class="week week2"><h1>Week 2</h1><ul><li>13th: We began our collaboration with Abhigyaan — a student run organization at BITS Goa.</li><li>19th: We met the iGEM OSU team regarding biocontainment and kill switch modelling.</li></ul></div><div class="week week3"><h1>Week 3</h1><ul><li>23rd: We had our first meeting with the University of Rochester and IITM and the Accessibility Initiative was started!</li><li>We made an initial prototype for WikiSync.</li></ul></div><div class="week week4"><h1>Week 4</h1><ul><li>30th: We met a farmer from the Tamil Nadu belt.</li><li>Set up Travis for CI/CD for development of WikiSync.</li></ul></div></article></div><div class="month" id="Jul20"><article><h2>July 2020</h2><div class="week week1"><h1>Week 1</h1><ul><li>4th: We met with the iGEM Groningen Team and learnt more about their project.</li><li>We started formulating a plan for the modelling of the biosensor.</li><li>We also had a meeting with our secondary PI to discuss various experimental designs that can be implemented.</li><li>Reorganized WikiSync codebase to split into modules for easier debugging.</li><li>We started working on our wiki and the Wiki Starter Pack.</li></ul></div><div class="week week2"><h1>Week 2</h1><ul><li>14th: We met with Andre Hermann regarding the sugar industry in Brazil and guidance on policy making. We also released our project logo!</li><li>15th: We started our Humans of iGEM initiative.</li><li>We incorporated feedback from iGEM Groningen into our kill switch model.</li><li>We wrote file classes, a basic HTML parser and started building the upload map functionality for WikiSync.</li><li>We added automatic citations functionality to the Wiki Starter Pack.</li></ul></div><div class="week week3"><h1>Week 3</h1><ul><li>22nd: We met with Dr Bejoy Thomas about our economic modelling.</li><li>25th: We hosted the first ever BioSummit!</li><li>Added a CSS parser to WikiSync.</li><li>Start writing tests for WikiSync.</li><li>Added some more features to Starter Pack.</li></ul></div><div class="week week4"><h1>Week 4</h1><ul><li>31st: The Indian teams got together for the first All India iGEM Meet!</li><li>Start writing documentation for WikiSync and Starter Pack along with more tests.</li></ul></div></article></div><div class="month" id="Aug20"><article><h2>August 2020</h2><div class="week week1"><h1>Week 1</h1><ul><li>We continued consulting with iGEM Groningen on our killswitch model and and began rethinking our approach. We also completed our biosensor model.</li><li>The required experimental protocols were finalised.</li><li>More tests and documentation for WikiSync.</li><li>Prepared Starter Pack for release during the Global Meetup.</li></ul></div><div class="week week2"><h1>Week 2</h1><ul><li>Our college reopened for the fall semester.</li><li>We practiced with iGEM Rochester for our Global Meetup sessions and recorded them.</li></ul></div><div class="week week3"><h1>Week 3</h1><ul><li>19th - 22nd: Our team hosted sessions during the Global Meetup.</li><li>We wrote usage guides for WikiSync along with some more features.</li></ul></div><div class="week week4"><h1>Week 4</h1><ul><li>30th: We had our first meeting with Synbio for Everyone where we discussed about our Accessibility initiative.</li><li>We restructured our economic model based on the feedback recieved during our AIIM presentation.</li></ul></div></article></div><div class="month" id="Sep20"><article><h2>September 2020</h2><div class="week week1"><h1>Week 1</h1><ul><li>We completed our model for the inoculant as well as auxotroph design.</li><li>We began designing the process flow diagram and industrial application of our product.</li><li>9th: We finalised our wiki illustrations and design!</li></ul></div><div class="week week2"><h1>Week 2</h1><ul><li>We began brainstorming on ideas for our promotional video and reached out to the Mime Club on campus.</li><li>We wrapped-up the Language project.</li></ul></div><div class="week week3"><h1>Week 3</h1><ul><li>This week was spent finalising our safety forms after feedback from PI.</li><li>We also submitted our biosafety proposal to the Biosafety Committee on campus.</li></ul></div><div class="week week4"><h1>Week 4</h1><p>MIDTERM WEEK!</p></div></article></div><div class="month" id="Oct20"><article><h2>October 2020</h2><div class="week week1"><h1>Week 1</h1><p>We started writing first drafts for the content on our wiki and worked on its design.</p></div><div class="week week2"><h1>Week 2</h1><ul><li>We completed animations for our homepage and added all the pages as per the Judging Form.</li></ul></div><div class="week week3"><h1>Week 3</h1><ul><li>We geared up for the wiki freeze and started working on the presentation video.</li></ul></div><div class="week week4"><h1>Week 4</h1><p>WIKI FREEZE!</p></div></article></div><div id="buttons"><a class="button prev" href="https://2020.igem.org/Team:BITSPilani-Goa_India"><span class="button-background"><span aria-hidden="" class="circle"><span class="icon arrow"></span></span></span><span class="button-text">Home</span></a><a class="button next" href="https://2020.igem.org/Team:BITSPilani-Goa_India/Experiments"><span class="button-background"><span aria-hidden="" class="circle"><span class="icon arrow"></span></span></span><span class="button-text">Experiments</span></a></div></div></div></div></main><footer><div id="footerNav"><div class="container"><div class="row justify-content-between"><div class="col-sm-6 col-md-4 col-lg-3 py-2"><a class="footer-heading">Project</a><ul><li class="py-1"><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Description">Description</a></li><li class="py-1"><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Design">Design</a></li><li class="py-1"><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Model">Model</a></li><li class="py-1"><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Engineering">Engineering</a></li><li class="py-1"><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Safety">Safety</a></li><li class="py-1"><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Implementation">Implementation</a></li></ul></div><div class="col-sm-6 col-md-4 col-lg-3 py-2"><a class="footer-heading">Human Practices</a><ul><li class="py-1"><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Human_Practices">Human-Centered Design</a></li><li class="py-1"><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Education">Science Communication</a></li></ul></div><div class="col-sm-6 col-md-4 col-lg-3 py-2"><a class="footer-heading">Parts</a><ul><li class="py-1"><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Parts">Parts</a></li></ul></div><div class="col-sm-6 col-md-4 col-lg-3 py-2"><a class="footer-heading">Journal</a><ul><li class="py-1"><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Notebook">Notebook</a></li><li class="py-1"><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Experiments">Experiments</a></li><li class="py-1"><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Appendix">Appendix</a></li></ul></div><div class="col-sm-6 col-md-4 col-lg-3 py-2"><a class="footer-heading">Team</a><ul><li class="py-1"><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Team">Team</a></li><li class="py-1"><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Attributions">Attributions</a></li><li class="py-1"><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Collaborations">Collaborations</a></li></ul></div><div class="col-sm-6 col-md-4 col-lg-3 py-2"><a class="footer-heading">Contribution</a><ul><li class="py-1"><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Contribution">Overview</a></li><li class="py-1"><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Software">Software</a></li></ul></div><div class="col-sm-6 col-md-4 col-lg-3 py-2"><a class="footer-heading">Entrepreneurship</a><ul><li class="py-1"><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Entrepreneurship">Entrepreneurship</a></li></ul></div><div class="col-sm-6 col-md-4 col-lg-3 py-2"><a class="footer-heading">Judging</a><ul><li class="py-1"><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Judging">Judging</a></li><li class="py-1"><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/Awards">Awards</a></li><li class="py-1"><a href="https://2020.igem.org/Team:BITSPilani-Goa_India/https:/igem.org/2020_Judging_Form?id=3512">Judging Form</a></li></ul></div></div></div></div><div id="footerBrand"><div class="container"><div class="row justify-content-center"><div id="footerTeamLogo"></div><div id="BITSLogo"></div></div><p>iGEM BITS Goa</p><p>Birla Institute of Technology and Science, Pilani</p><p>K K Birla Goa Campus</p><p>NH-17B, Sancoale, Goa, India</p><div class="row justify-content-center" id="footerIcons"><a class="gmail" href="mailto:igembitsgoa@gmail.com"></a><a class="insta" href="https://instagram.com/igem_bits" rel="noopener" target="_blank"></a><a class="twitter" href="https://twitter.com/igembitsgoa" rel="noopener" target="_blank"></a></div></div></div></footer><script src="https://2020.igem.org/Template:BITSPilani-Goa_India/notebook-bundleJS?action=raw&amp;ctype=text/javascript"></script></body></html>

Latest revision as of 17:08, 16 December 2020

Notebook | SugarGain | iGEM BITS Goa

The Safari browser doesn't support some features of this website. Please switch to Firefox, Edge or Chrome for a better experience.

Notebook

January 2020

Week 1

  • 4th: We had our first full team meeting!

Week 2

  • 6th - 15th: Brainstormed about various project ideas with our PI and decided to work on post-harvest losses in sugarcane.
  • 15th: We attended the BITSAA Global Meet that provided us with the opportunity to interact with alumni from our university, pitch our project idea and gain valuable feedback.
  • 18th: We met with Mr Sunil Kumar Ohri from the Sugar Federation in UP.

Week 3

We conducted our initial growth curve experiments in sugarcane media. We looked at multiple dilutions and clarification methods.

Week 4

We brainstormed about the growth curve model and completed the experiments.

February 2020

Week 1

  • 2nd: We had our first meeting with Varsha Jaisimha (iGEM Ambassador to Asia Pacific). Since we are a first time team, she was instrumental in guiding us on how to get started.

Our team conducted extensive research and literature review. We also began our sponsorship drives and our crowd funding initiatives.

Week 2

We met our PI to work out finer details about our project and thought about how to incorporate Varsha's initial feedback.

Week 3

We began our initial PCR of invertase of Arabidopsis thalliana.

Week 4

We were on a break this week due to our midterms.

March 2020

Week 1

MIDTERM WEEK!

Week 2

  • 13th: We began our experiments for capillary action in sugarcane.
  • 14th: Instruction at university was suspended in lieu of the COVID-19 pandemic.

Week 3

No work could be done as everyone was still adjusting to the new normal.

Week 4

We had our first virtual team meeting! This meeting was crucial for us to redefine our approach. We formulated a weekly schedule for our team meetings.

We restructured our team into subgroups and decided to meet twice a week for working sessions.

April 2020

Week 1

  • 1st - 7th: We had the meetings for the sequences and modelling teams.

Week 2

We had follow up meetings with Varsha to discuss how to go about our project virtually.

Week 3

We started designing the Atmosphere Regulated Killswitch (BBa_K3512042). We began formulating the design of the model for the killswitch.

Week 4

Conducted literature review for the pFruB-Cra module and the kill switch to determine a few parameters.

May 2020

Week 1

  • We conducted docking studies of anti-invertase and invertase.
  • We also modified our approach in the in silico modelling of our pFruB-Cra system and kill switch.
  • Our wet lab team began the construction of the pFruB-Cra sequences.
  • We searched for contacts of farmers to augment our human practices approach.

Week 2

We continued working on tasks from the previous week and set up meetings with farmers in Gulbarga and Mandya.

Week 3

  • We met the farmers from Gulbarga and Mandya.

Week 4

We thought about how we could implement their suggestions in our design.

June 2020

Week 1

  • We created the initial model of our kill switch and growth curve. We also sent our biobrick sequences to our PI for verification.
  • We met the Chief Chemist from the Kichha Sugar Company.

Week 2

  • 13th: We began our collaboration with Abhigyaan — a student run organization at BITS Goa.
  • 19th: We met the iGEM OSU team regarding biocontainment and kill switch modelling.

Week 3

  • 23rd: We had our first meeting with the University of Rochester and IITM and the Accessibility Initiative was started!
  • We made an initial prototype for WikiSync.

Week 4

  • 30th: We met a farmer from the Tamil Nadu belt.
  • Set up Travis for CI/CD for development of WikiSync.

July 2020

Week 1

  • 4th: We met with the iGEM Groningen Team and learnt more about their project.
  • We started formulating a plan for the modelling of the biosensor.
  • We also had a meeting with our secondary PI to discuss various experimental designs that can be implemented.
  • Reorganized WikiSync codebase to split into modules for easier debugging.
  • We started working on our wiki and the Wiki Starter Pack.

Week 2

  • 14th: We met with Andre Hermann regarding the sugar industry in Brazil and guidance on policy making. We also released our project logo!
  • 15th: We started our Humans of iGEM initiative.
  • We incorporated feedback from iGEM Groningen into our kill switch model.
  • We wrote file classes, a basic HTML parser and started building the upload map functionality for WikiSync.
  • We added automatic citations functionality to the Wiki Starter Pack.

Week 3

  • 22nd: We met with Dr Bejoy Thomas about our economic modelling.
  • 25th: We hosted the first ever BioSummit!
  • Added a CSS parser to WikiSync.
  • Start writing tests for WikiSync.
  • Added some more features to Starter Pack.

Week 4

  • 31st: The Indian teams got together for the first All India iGEM Meet!
  • Start writing documentation for WikiSync and Starter Pack along with more tests.

August 2020

Week 1

  • We continued consulting with iGEM Groningen on our killswitch model and and began rethinking our approach. We also completed our biosensor model.
  • The required experimental protocols were finalised.
  • More tests and documentation for WikiSync.
  • Prepared Starter Pack for release during the Global Meetup.

Week 2

  • Our college reopened for the fall semester.
  • We practiced with iGEM Rochester for our Global Meetup sessions and recorded them.

Week 3

  • 19th - 22nd: Our team hosted sessions during the Global Meetup.
  • We wrote usage guides for WikiSync along with some more features.

Week 4

  • 30th: We had our first meeting with Synbio for Everyone where we discussed about our Accessibility initiative.
  • We restructured our economic model based on the feedback recieved during our AIIM presentation.

September 2020

Week 1

  • We completed our model for the inoculant as well as auxotroph design.
  • We began designing the process flow diagram and industrial application of our product.
  • 9th: We finalised our wiki illustrations and design!

Week 2

  • We began brainstorming on ideas for our promotional video and reached out to the Mime Club on campus.
  • We wrapped-up the Language project.

Week 3

  • This week was spent finalising our safety forms after feedback from PI.
  • We also submitted our biosafety proposal to the Biosafety Committee on campus.

Week 4

MIDTERM WEEK!

October 2020

Week 1

We started writing first drafts for the content on our wiki and worked on its design.

Week 2

  • We completed animations for our homepage and added all the pages as per the Judging Form.

Week 3

  • We geared up for the wiki freeze and started working on the presentation video.

Week 4

WIKI FREEZE!