NOTEBOOK
Our Team's Memorabilia
Monthly progress & Milestones
- 2019 December
- 2020 NUDT_CHINA team set-up.
- 2020 January
- Team member split into groups: Wet Lab, Human Practice, Wiki design, Model.
- Learn the basic theory part of the experiment.
- 2020 February
- Brainstorm for 2020 team project.
- 2020 March
- Participate in CCIC online meeting to get 2020iGEM related information and project guidance.
- Discuss the 2019iGEM project in depth and determine the direction of the 2020iGEM project,considering the switch from transcriptional regulation to direct regulation of the Predator system.
- Conduct preliminary Proof of Concept design and plasmid design.
- 2020 April
- The first online collective meeting to discuss the 2020iGEM project and anchor the modularization induced by small molecules as the field to anchor our project.
- 2020 May
- Collection and study of relevant literature on the project.
- Successfully design the plasmid.
- Conduct the experiment about Proof of Concept and feedback the results to HP and Model.
- 2020 June
- The first offline meeting of the experimental group to report the progress of the project and arrange the follow-up tasks.
- 2020 July
- The second offline meeting of the experimental group for literature reading.
- 2020 iGEM oral selection.
- 2020 August
- The third offline meeting of the experimental group for literature reading.
- Conduct relevant experimental basic learning, including software design and skill training online.
- Carry out specific experimental operations related to the project under the guidance of teachers.
- Team uniform design.
- Online communication meeting of the Five-University Alliance.
- Establish experimental cooperation relationship with BNU_CHINA and conduct online communication to reach relevant agreement on experimental cooperation.
- Participate CCIC communication online to observe the presentation of other projects and look for the possibility of cooperation within experiment and HP.
- Interview experts and receive optimization suggestions.
- Combine the advice and the feedback from Model to redesign the Proof of Concept to achieve higher experimental stability.
- 2020 September
- Successfully complete the Proof of Concept and carry out the experimental design of Demonstration.
- Online communication meeting with CSU_CHINA for in-depth discussion of follow-up cooperation.
- Complete the Demonstration experiment, feed the results back to Model group, and carry out the optimization design of experiment.
- The optimized Demonstration experiment obtain better effect.
- 2020 October
- Take family photos and make promotional video.
- Conduct offline Communication meetings with CSU_CHINA and reach consensus on deep cooperation in collaboration, interview and science communication.
- Conduct a second round of expert interviews, and consider changing experimental targets and regulation methods based on advice.
- Through a large amount of literature reading and combined with the application prospect of the project, a new regulation method is successfully found and the target is targeted at TDP-43.
No. 109 Deya Road, Kaifu District,
Changsha, Hunan Province 410073
P.R.China